This 116,228 sq. ft. facility for Tri-County Electric Cooperative in Hooker, Oklahoma has many notable features including a fuel island, car wash, vehicle life system, geothermal heating system, and in-floor heating. The office portion is steel-framed with metal exterior studs and trusses. The warehouse, vehicle storage, and maintenance buildings are tilt-up concrete with pre-engineered metal building framing and rooves.
Tri-County Electric Cooperative – Oklahoma
Hooker, OK
New Headquarters