Tri-County Electric Cooperative

Tri County January adj 2012
018 Tri County January 2012
022 Tri County January 2012
023 Tri County January 2012
030 Tri County January 2012
026 Tri County January 2012
031 Tri County January 2012
034 Tri County January 2012
024 Tri County January 2012
033 Tri County January 2012
017 Tri County January 2012

Project Description:

Tri-County Electric Cooperative was challenged with an aging, multi-building  facility located in the center of the City of Lancaster.

The new 29,925 sq.ft. facility on 15 acres improved access to the facility for the members as well as the line crews by being located directly on a major Highway.  Operational efficiencies were improved by locating all of the functions of the facility at a single location compared to being previously located in four separate buildings divided by city streets. Meeting the needs of the facility at the best value for the members was a main goal of the design.

A pre-engineered metal building system was utilized for reducing the initial cost of the building structure while a ground source mechanical system reduced operational cost for the life of the building by reducing the energy use for heating and cooling the building.

Project Size: 29925 sq.ft.

Project Location: Lancaster, MO