![](https://coopbuildingsolutions.com/wp-content/uploads/2022/05/Cimarron_Electric_Cooperative_-_Dec_2018-6-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/05/Cimarron_Electric_Cooperative_-_Dec_2018-3-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/05/Cimarron_Electric_Cooperative_-_Dec_2018-2-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-7-1-1024x682.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-12-2-1024x682.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-13-1024x682.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-14-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/Cimarron_Electric-Cooperative-2-1024x683.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/07/DJI_0203-1024x575.jpg)
![](https://coopbuildingsolutions.com/wp-content/uploads/2022/05/Cimarron_Electric_Cooperative_-_Dec_2018-12-1024x575.jpg)
This project for Cimarron consisted of a new 21,110 sq. ft. warehouse facility and a 15,750 sq. ft. renovation to their existing warehouse. The new warehouse building was constructed first to allow a phased move in for the existing warehouse. The warehouse is designed as a pre-engineered steel building with pull-through truck bays designed to eliminate reverse truck traffic. LED lights and other energy efficient design concepts are utilized throughout the building.
The existing warehouse was transformed into a new engineering and operations center with an open concept office and industrial feel. The original warehouse building was built with a pre-engineered steel building design and was modified to increase natural daylight into the space. A storm-hardened area for disaster recovery and protection of critical operations was also added. Site improvements were made as a result of the expansions including a new generator, site paving, and utility enhancements.