Midwest Energy and Communications

034 Midwest Energy Coop_Paric_Sept 2017
035 Midwest Energy Coop_Paric_Sept 2017
009 Midwest Energy Coop_Paric_Sept 2017
011 Midwest Energy Coop_Paric_Sept 2017
014 Midwest Energy Coop_Paric_Sept 2017
018 Midwest Energy Coop_Paric_Sept 2017
026 Midwest Energy Coop_Paric_Sept 2017
028 Midwest Energy Coop_Paric_Sept 2017
030 Midwest Energy Coop_Paric_Sept 2017
003 Midwest Energy Coop_Paric_Sept 2017
013 Midwest Energy Coop_Paric_Sept 2017
058 Midwest Energy Coop_Paric_Sept 2017
052 Midwest Energy Coop_Paric_Sept 2017

Project Description:

This new 129,000 sq. ft. headquarters facility is located in Cassopolis, Michigan. Midwest Energy has experienced significant growth in the internet services division, which is a major contributor to their new facility needs.

This building consists of a two-story tilt-up office building, a one-story warehouse, vehicle storage, material storage, and maintenance building, all built on over 30 acres. The office is designed with an open floor plan, to support the culture of Midwest Energy, to provide a collaborative atmosphere. A 6,000 sq. ft. data center was constructed out of concrete walls and a hardened construction frame. The façade is designed with insulated, load bearing concrete walls, with a structural steel framing system. The buildings are designed with energy efficient concepts including geothermal HVAC and LED lighting. 

Cooperative Building Solutions completed this project in the Fall of 2017.

Project Size: 129000 sq.ft.

Project Location: Cassopolis, MI