Co-Mo Electric Cooperative

001_Tipton CoMo_Aug 2013
CoMo Aerial
007_Tipton CoMo_Aug 2013
006_Tipton CoMo_Aug 2013
008_Tipton CoMo_Aug 2013
009_Tipton CoMo_Aug 2013
005_Tipton CoMo_Aug 2013
002_Tipton CoMo_Aug 2013
004_Tipton CoMo_Aug 2013
003_Tipton CoMo_Aug 2013

Project Description:

Co-Mo Electric Cooperative is located near the center of the state. The main office has been at the current location since the 1950’s. The original office had an attached garage and a separate warehouse with a loading platform. The existing attached garage area was too small for construction trucks and larger service trucks. A separate vehicle storage building is located on the site. The existing office has been added to twice over the last 30 years, which created additional corridor requirements for circulation, and office spaces that can only be accessed through adjacent spaces.  

Cooperative Building Solutions master planned the existing site to maximize the available space as well as improving site circulation, expansion capabilities for future needs and a phased approach for the construction of the building components. Utilizing a vehicle storage building design with drive through vehicle bays limits the need to back vehicles in and out of the building which enhances the safety on the site. Connecting the warehouse and the operations offices and critical function spaces to both the warehouse and vehicle storage improved efficiency and limited the amount of redundant support spaces. The building is situated to allow the existing vehicle storage building to remain as well as the existing administrative offices and customer services.

Project Size: 75000 sq.ft.

Project Location: Tipton, MO